So you´ve decided to go green? What´s next?

System Designs and Steps

So you´ve decided to go green? What´s next?

At SSU we take control of everything from the personalised design, installation and final paperwork with the CFE. Step be step:

  • Review of the installation site, orientation and design of the panels.
  • Installation Day! Average of 4 paneles per day but can vary from project to project
  • Testing of the installation and revision of structure and perforations
  • CFE Paperwork and “carta poder” handed in at the CFE
  • CFE Generates the new contract of “Interconexión”
  • New Bidireccional Medidor installed. (Average of 13 business days from the original request
  • Turn on the system, configure the monitoring system and wait for the savings in the next electricity bill

Related Course

Residencial

Residencial

Residential Projects / DAC Tariff The most expensive residencial tariff found in Mexico is the De …

Read More
Business

Business

Businesses / PDBT Tariff The PDBT tariff (previously called 02) is the second most expensive in …

Read More